STAR OPUS I, EPISODE 1 - 'pathway to the POLLUX' out now!
"It is year 2237. They came
from behind the stars.
They came from unknown. They took our galaxy.
The 'Huge Kaou Pih' is stronger than ever.
It's a war now."
Star Opus is zero-setup game. Just download
the file and click to play.
It is freeware.
Download it
now and enjoy the art of the space arcade gaming.
This one-man-indie-project called Star Opus I is the real mother of all space
action adventure games. Including 50 jump points to explore, 25
different enemies with twisted and advanced steering behaviours. Destroy
alien hex- cities, beware black holes. Navigate your way to the 'Huge Kaou Pih' and finalize them. Bring the peace to our Galaxy
again.
The first episode called Star Opus I, Episode 1 - 'Pathway to
the Pollux' is now
downloadable. This episode is
freeware and includes music tracks
from EMS- Project ('Liquid World', 'Valentina' & 'The Circle').
Episode 2, called 'Journey to the Kaou Pih' is now under
construction and coming out this year. This episode ends the first
part of the Star Opus I. Parts II and III leads player to the
ground and the deep caves of the
Huge Kaou Pih.
"This will be the one of the most enjoyable space action
adventure game for a
long time. Really nice physics - and the steering behaviours of the aliens are just so
stunning."
- FSR- Retro- Magazine.
Other Star Opus I reviews:
Mikrobitti - päivän peli 11.05.2011
FindMySoft
Play This Thing
PlenHry
FrostClick
See also BlitzMax site.
Know your enemy:
|
|
Introducing Rotator. Very very
common alien in just almost of all jump points. There are
couple of different Rotator variants. Some of them can
protect the master Rotator. Some of the variants have
attacking ability. They are not so harmless after all;
you'll see... Weapon(s): Laser gun. |
![]() |
Rotator Evolved.
Evolved version of basic Rotator. Weapon(s): Not known. |
|
|
Roller.
Roller has an ability to throw multiple bombs at the same
time. Quite slow but dangerous. Weapon(s): Bionic bombs. |
![]() |
Twirler.
Twirler has an ability to reflect back users shots
doubled. In several cases this alien can be a real pain in
the ass. Weapon(s): Reflected lasers x 2. |
|
|
Turret.
Turret is the enemy cannon using heavy weapons. Weapon(s): Plasma cannon. |
|
|
Beamer.
Generates 1-4 large and rotating laser beams. Really
frightening enemy. Weapon(s): Laser beams. |
|
|
Rotating
star. This enemy has some special
healing abilities & dual life system installed. Weapon(s): Grenades. |
|
|
Square.
Heavily armoured, effective & aggressive. Weapon(s): Grenades. |
|
|
Protector. Generates massive
multilayered energy field to protect other enemies. Weapon(s): Grenades |
|
|
Patroller. Patrols predefined areas.
Quick but dumb. Weapon(s): Laser gun. |
|
|
Shadow. Lightning fast alien using
unknown energy methods. Weapon(s): Laser gun. |
|
|
Space ant. Slow but unpredictable alien. Weapon(s): Near distance and long distance bionic bombs. |
|
|
Spider. These toxic little aliens are
living in a big bunches connected to each other. Weapon(s): Not known. |
![]() |
Alien base. Produces various
aliens. Weapon(s): Laser cannon. |
Screenshots (click images)
| Galaxy Map. |
Tarazed Jump point. |
The Portal is opening... |
Blasting the Capsule. |
Entering to Yed Prior. |
Something's wrong in Sablik. |
| Three bunchies of Space
ants. |
Visitor comments
Last 2 comments...















